Powered by ZigaForm version 3.4.1
Back to Projects

Car Wash Terrell,Tx

Project
Car Wash
Services Provided
Dismantling and demolition of two structures
Location
902 E Moore Ave Terrell, Tx
Duration
2 Days
Scope
Dismantled sheet metal from structures down to brick, which we then peeled back to reveal purlins which were then dismantled and saved per owners request. Total time for demolition and haul off was 2 days.
icon icon icon icon
Back to Projects

Excellent job but most of all Great communication! Value for work done was great as well.

Pat Armstrong All Testimonials